Menu

Pokuase-Nsawam Road: Kwame Agbodza's axle load regulation reforms apt - JAPTU Ghana

This article is closed for comments.

Read Comments Comments (8)

  • The Motherland 11 months ago

    Now everyone can see that vermin MUMBI SERAKI refusing to take a dose of his own prescription, else we would have been rid of him by now and he wouldn't still here polluting this platform with his idiotic suicidal ideation

  • Owolabi 11 months ago

    Your motherland stinks loser ..

  • Paa Joe 11 months ago

    Axle load enforcement on our roads is over due. There must be permanent weighing bridges at vantage points along the major roads to check the trucks 24 hours.
    Weight limits must be introduced on secondary and minor roads. T ...
    read full comment

  • Alberto 11 months ago

    Too many propaganda just fix the road first before anything else.

  • No Mercy 11 months ago

    Too Much talking talk talk, but nothing is done, The weight of Truck is 40 Tonnes.But load of Truck is over 60 tonnes.This can not happen in Europe

  • Joshua 11 months ago

    I hope they are also putting in place measures and or institutions to ensure that the roads built are not full of potholes 1-2 years after commissioning them.