DOSSIER: FPSO Kwame Nkrumah
The FPSO Kwame Nkrumah is a floating production storage and offloading vessel. It operates in the Jubilee oil fields off the coast of Ghana.
-
Slow paced Tamale interchange construction stalls business activities
-
Gas supply from Jubilee to shutdown for 21 days
-
FPSO Kwame Nkrumah to shutdown for maintenance
-
FPSO Kwame Nkrumah to shut down for repairs
-
Shutdowns of FPSOs taking a toll on government revenue – Minister reveals
-
No power cuts during FPSO shutdown – VRA assures
-
FPSO shutdown won’t affect power supply – Government assures
-
FPSO to shut down January, March 2018 – Boakye Agyarko
-
Jubilee FPSO anchored as tugs move off after 12months
-
Tullow adopts 3-phase plan to convert FPSO
-
Tullow defers payment of dividends to shareholders
-
Tullow meets gov’t over Jubilee development plan
-
First Lady launches FPSO John Agyekum Kufuor in Singapore
-
Shutdown of Ghana Gas will not cause dumsor - ECG
-
Sankofa Gye-Nyame FPSO to be named after Kufuor
-
Tullow to resume 90 mmscf gas supply to Ghana Gas
-
Ghana’s 3rd FPSO to arrive in March 2017 – ENI
-
Tullow insured for business interruption losses in Ghana
-
FPSO shutdown hurts Ghana’s economic growth
-
FPSO Nkrumah gets Hull & Machinery insurance
-
Ghana’s 15% interest in TEN project not a rip off - GNPC
-
TEN project will produce 23,000 oil barrels daily – Tullow
-
FPSO Kwame Nkrumah to be fully restored in mid-2018
-
Jubilee partners to cough US$150m to fix FPSO
-
Economic growth rate down to 3.2 per cent
-
Ghana Gas increases gas supply to VRA
-
Ghana losing $9.9m to AMERI monthly
-
False fire alarm shuts FPSO Kwame Nkrumah
-
Construction of third FPSO underway – Terkper
-
FPSO Nkrumah needs long-term fixing - ACEP
-
FPSO to be converted into spread mooring
-
2017: 12-wk FPSO Nkrumah shutdown for $150m fixing
-
Tullow to fix damaged bearings on FPSO Kwame Nkrumah
-
Tullow weighs three options to fix FPSO Nkrumah
-
FPSO Kwame Nkrumah resumes operations
-
FPSO Atta Mills to start production soon – Mahama